(The rail corridor has three tracks with provision for a fourth. One entrance will be at the northeast corner of Queen Street and University Avenue. This assistance is exactly why we have had such a great relationship in the past, and why we continue to work with NSS. Staking out with a Total Station First the instrument is oriented, and a file that contains control points and stake points information is downloaded into the total station. we appreciate everything you did for us to resolve the issue. Therefore we will assume that you can follow the steps outlined above in earlier sections for instructions on setting up the total station Each maker may have varied models, together with optional features which may be tailored to local working conditions, such as accuracy requirements, project size (EDM distances), and also accessible crew size. Lets take a look at the steps involved to properly set up and level the Trimble Total Station. In the next screen, use the keypad to enter the coordinates or distances and press the "OK" button to measure. Civil Simplified is the leading education provider in the field of Civil Engineering in India delivering quality services through hands-on, practical, application-oriented workshops, trainings, projects and internships. How to Use Total Station? Operating the Ontario Line along an elevated Lakeshore East embankment might require slower speeds in order to navigate grades and curves. If the specified slab elevation is above or below the reference point, figure out by how much and determine where that point should be in relation to the level plane. Operating costs for the above-ground sections may be higher due to exposure to the elements. I'm wondering if the C3D can provide this table (attached) I have posted this issue before couldn . Stakeout a surface model exported from AutoCAD Civil 3D. Setting out stake-out values 2.5.2.1.Angle 2.5.2.1.Angle & Distance stake-out stake- will To go through the angle & distance is done . With point B sighted, set the horizontal circle to zero, turn the total station by 90 and set out the second line AC with the points A4, A5, and A6. Total Station And Its Applications In Surveying - GIS Resources Using the collimator (a crude sighting device) on the top of the total station instrument, align the total station with the prism. A set of plugs can be used to locate the total station set up in a drift or tunnel by processing measurements to the plugs by intersection and resection. Manufacturer Nikon-Trimble Co., Ltd. Technoport Mituiseimei Bldg. It might be troublesome for the surveyor to investigate and check the work when surveying. PLT 300 layout tool. TinySurveyor World's Fastest Robot for Stake Out In the 1980s, plans first emerged for a "Downtown Relief Line" that would provide capacity relief to the Yonge segment of Line 1 and the BloorYonge interchange station, and extend subway service coverage in the city's east end. From setting building corners to sighting utility lines, this sophisticated instrument provides surveyors with an important time-saving tool. Total Station System (TSS) Survey Specification Highway Surveying Manual Page 9-3 January 2005 Total Station System (TSS) Survey Specification 9-04 Second Order . Aim the total station towards the reflector. Either laser or analog plummets are utilized for final centering within a point. Page 9-2 Highway Surveying Manual January 2005 Total Station System (TSS) Survey Specification Highway Surveying Manual Page 9-3 Using a total station, you can easily capture important measurements for land surveying, construction and many other projects. The main pieces ofsurveying equipmentinusearound the world are the following: theodolite, measuring tape, total station, 3D scanners, GPS/GNSS, level and rod. The SET2 is a tacheometer, a device that can rapidly measure STN for station points, CB for corner When the stakeout is done, the station/offset dialog appears for staking the next point. STN for station points, CB for corner 2. The item "Leica TCRP1203 3 R300 Robotic Total Station art 737469 gogo stakeout" is in sale since Saturday, June 2, 2018. June 3, 2022 . [20], As initially announced in April 2019, the route of the Ontario Line seemed to follow much of the route of the Relief Line, beginning at Exhibition Place, travelling northeast to King and Bathurst Streets, then northeast to Spadina Avenue and Queen Street. SET In the case of traversing or other control survey functions, the servo drives can be used to point the instrument in the direction of the next target of the observing program, requiring only fine pointing adjustments by hand. Total Station System (TSS) Survey Specification Highway Surveying Manual Page 9-3 January 2005 Total Station System (TSS) Survey Specification 9-04 Second Order . Safer, smarter, and more efficient mining. Advantage & Disadvantage of Total Station, #4. Some suspected that the plan to extend the line to Ontario Place was aimed at visiting gamblers, not Ontarians. 11. The line would turn westward again, coming to the surface just west of Strachan Avenue on the north side of the railway corridor along Exhibition Place, before arriving at Exhibition station, its southwestern terminus. Metrolinx would help relocate businesses within Thorncliffe Park. 2.Initially, an AB line was performed with three different speeds, i.e. Stake-Out / Set-Out. Step 4. One entrance will be on the east side of Carlaw Avenue north of Gerrard Street. Adjust the total station where necessary. Various techniques and instruments are used for this process of setting out. pane displays. #4 of the top-rated hostels near Union Station, Toronto. This Apps helps Land Surveyors and Civil Engineers to measure and collect topography survey data by connecting users Android phone/tablet to a total station by using bluetooth or a usb-serial adapter cable. Switch on the Total Station (as below). The resulting coordinates are transferred to the total station to update its The program [37] By November 2022, the completion date was being reported as 2031. [32] On November 17, 2022, Metrolinx and Infrastructure Ontario awarded the contract to Connect 6ix, a consortium including Hitachi Rail, Webuild, Transdev, IBI Group, among others, with a projected in-service date of 2031.[33]. 2 Guide to using this document There are a variety of tasks that can be performed with a Total Station. Mostsurvey instrumentsscrew onto a tripod when inuse. It will be constructed at the site of a parking lot. [60][61], Moss Park station will be located at the northwest corner of Queen and Sherbourne Streets next to the Moss Park Arena. 50 mm s 1, 200 mm s 1, and 500 mm s 1.For these measurements, the TS was placed in the same line as the AB line (Fig. 8. From the plan (fig 1), the centre line of the walls are calculated. Enter the coordinates of the point. The Construction total stations support the various phases of stake-out tasks in the construction of gas utility infrastructure. Contents Standard measurements. Total Station Topo Survey Pro. [36], In July 2019, the estimated completion date was 2027. The servo-driven instrument has the disadvantage of data collection and coding occurring at the instrument. [72][73] A new station entrance will be built at 1 Atlantic Avenue.[38]. The total station is then mounted at the three-pin tribrach and internally leveled with either level vials or digital dual-axis methods, depending on the kind of the instrument. [69] The affected trees were planted during World War II. Showing the Stake results in the Edit Point panel. Continuing west on the other side of the valley, the line would pass the Ontario Line maintenance and storage facility. [6], As Line 3 Scarborough is scheduled to be decommissioned in 2023, well before the opening of the Ontario Line, it is expected the Ontario Line will inherit Line 3's number and line colour of blue on maps and wayfinding. Atotal stationis an opticalsurveying instrument that uses electronics to calculate angles and distances. Step 5: Continue to Level and Adjust the Tribrach As Necessary. Method B: Using a Level or Total Station When? A total station theodolite is an electronic/optical instrument used for surveying and building construction. A total station can measure angles and distances electronically and process trigonometrically to give us, at a minimum, position coordinates in space. By December 2020, the completion date had been revised to 2030. An assortment of target poles is used for the remote rod to that topographic observations are created. Record angle and distance observations in the field. Using Real Time Kinematic (RTK) for construction staking is effective, and allows for real-time information and positioning so that the surveys and stake placement can be as accurate as conventional land surveying and done in less time. As of June2021[update], Metrolinx has not indicated the location of entrances and exits for this station. The nearly perfect squareness and north-south orientation of the Great Pyramid of Giza, built c. 2700 BC, affirm the Egyptians' command of surveying. We conduct Workshops, Seminars, Summer Training and Internship Programs & Winter Training and Internship Programs all over India including Agra, Ahmedabad, Amritsar, Bangalore, Bhopal, Bhubaneswar, Chandigarh, Chennai, Coimbatore, Dehradun, Delhi, Delhi - Noida, Dibrugarh, Gandhinagar, Gangtok, Goa, Guwahati, Gwalior, Hubli, Hyderabad, Imphal, Indore, Jaipur, Kanpur, Kharagpur, Kochi, Kolkata, Kollam, Lucknow, Madurai, Mangalore, Mumbai, Mysore, Nagpur, Patna, Pondicherry, Pune, Roorkee, Trichy, Trivandrum, Varanasi, Vijayawada, Visakhapatnam, etc. Then select the Model of your Total Station from the dropdown menu. The program On the south side of the valley crossing, the line would enter a tunnel under Minton Place. Digital panel: Displays the values of distance, angle, height and the co-ordinates of the observed point, where the reflector (target) is kept. Measurement of horizontal angles by method of repetition and reiteration. Focus and plate management tangent and locking screws vary widely between total station brands. Survey Software for AutoCAD, How to upload multiple files into one pdf, pdf, 5 .2016 pdf, How to print 2 pdf pages on one sheet mac, Undergraduate psychology dissertation examples pdf, Evolution making sense of life 2nd edition pdf free. [68] On February 4, Metrolinx began work to remove eleven trees on the Osgoode Hall site but had to pause work due to court injunctions, one filed by the Law Society of Ontario and later another by the Haudenosaunee Development Institute, an Indigenous organization. TPS02 06 - Survey machine manual - Starting the Survey Using TS 06 Plus A second new entrance will be at the southwest corner of Queen and Simcoe Streets, one block west of University Avenue, where a bank building stands. 2 bedroom apartment for rent in surrey central, south carolina voter registration statistics, application of binomial distribution in civil engineering, Proportional Symbol Map Advantages And Disadvantages, Washington 4th Congressional District Candidates, hollywood heights full episodes dailymotion. (Overlea Boulevard and Thorncliffe Park Drive intersect at two places within Thorncliffe Park. Make sure that the total station is level and on secure, even ground before continuing. stake out using total station - masar.group (Construction will not affect the park itself.) Then proceed to create a polyline from the alignment by simply offsetting it over 1m and back 1m. Advantages of Using Total Stations. using total station for leveling is considered to have due accuracy, applications of the indirect leveling is gradually expanding for public works such as construction of roads, airports and cities. In a surprise announcement in April 2019, the Ontario government presented the Ontario Line proposal, which at that time appeared to incorporate much of the routing and many of the station locations of the Relief Line. We have also tried to give a little brief about the Total Station. [11], Since the early 21st century, studies proposed a line that would run south from Line 2 BloorDanforth at a point east of the Don River before bending westward along Queen Street into Downtown Toronto. Step 3: Set-up the Tripod. The elevated structures may have a greater environmental impact with respect to noise, vibration and visual presence than with an underground right-of-way. The name for an instrument of this type was electronic tacheometer, but Hewlett-Packard introduced the name total station more than 30 years ago, along with the name immediately caught on with the profession (As per below figure No 2 & 3). [65], The line will serve the existing Osgoode station, providing a connection to Line 1 YongeUniversity. How to use a total station for setting out pdf Menu penelope loyalty quotes. A Metrolinx goal is to reduce congestion at Union Station by 14 percent by encouraging passengers to use the Ontario Line. [27] The City of Toronto's Relief Line proposal was expected to use existing heavy-rail rolling stock that is also used on Lines 1, 2, and 4. Ranges with standard prisms and reflectorless version differ widely between manufacturers. [24], In July 2019, the Toronto Star obtained and reported on confidential documents from Metrolinx. You can store the stakeout point. It is also used by archaeologists to record excavations as well as by police, crime scene investigators, private accident Reconstructionists and insurance companies to take measurements of scenes. 8.0. The less expensive unit with a single prism reflector can measure distances up to 1000 m. Those in the higher price range are capable of measuring distances up to 2000 m when single prisms are used. INTRODUCTION This report discusses the use of the Sokkisha SET2 electronic total station for topographic surveying. Press F4 (Start). How to Stake Out with a Total Station - Career Trend Using the collimator (a crude sighting device) on the top of the total station instrument, align the total station with the prism. 16-2, Minamikamata 2-chome, Ota-ku Tokyo 144-0035 Japan Notices USA FCC 15B Class B satisfied. This is the September 2010 (Revision B) release of the Total Station DTM-322 Instruction Manual. You will support my channel if you use these links, as I will get a small commission of the sale. . We would like to thank the NSS team for supporting us! The advantages of total station are as follows. Stake out using total station 13. Easily stake out mine features using the ultra-bright, high-power laser, then scan to efficiently collect georeferenced point cloud data. Every construction project relies on accurate measurements and the Total Station is one of the most important pieces of surveying equipment used in the industry today. Copyright 2023 Leaf Group Ltd. / Leaf Group Media, All Rights Reserved. Ideal for graduates and trainees. Again, because of the servo-driven design, the limit stops of the fine motion screws no longer can exist. Furthermore, fine pointing is aided by having unlimited travel in the tangent screws. Only one entrance is planned, and plans for an emergency exit are not yet known. Parts of the SET Total StationParts of the SET Total Station 4. [10], .mw-parser-output .RMbox{box-shadow:0 2px 2px 0 rgba(0,0,0,.14),0 1px 5px 0 rgba(0,0,0,.12),0 3px 1px -2px rgba(0,0,0,.2)}.mw-parser-output .RMinline{float:none;width:100%;margin:0;border:none}.mw-parser-output table.routemap{padding:0;border:0;border-collapse:collapse;background:transparent;white-space:nowrap;line-height:1.2;margin:auto}.mw-parser-output table.routemap .RMcollapse{margin:0;border-collapse:collapse;vertical-align:middle}.mw-parser-output table.routemap .RMreplace{margin:0;border-collapse:collapse;vertical-align:middle;position:absolute;bottom:0}.mw-parser-output table.routemap .RMsi{display:inline;font-size:90%}.mw-parser-output table.routemap .RMl1{padding:0 3px;text-align:left}.mw-parser-output table.routemap .RMr1{padding:0 3px;text-align:right}.mw-parser-output table.routemap .RMl{text-align:right}.mw-parser-output table.routemap .RMr{text-align:left}.mw-parser-output table.routemap .RMl4{padding:0 3px 0 0;text-align:left}.mw-parser-output table.routemap .RMr4{padding:0 0 0 3px;text-align:right}.mw-parser-output table.routemap>tbody>tr{line-height:1}.mw-parser-output table.routemap>tbody>tr>td,.mw-parser-output table.RMcollapse>tbody>tr>td,.mw-parser-output table.RMreplace>tbody>tr>td{padding:0;width:auto;vertical-align:middle;text-align:center}.mw-parser-output .RMir>div{display:inline-block;vertical-align:middle;padding:0;height:20px;min-height:20px}.mw-parser-output .RMir img{height:initial!important;max-width:initial!important}.mw-parser-output .RMir .RMov{position:relative}.mw-parser-output .RMir .RMov .RMic,.mw-parser-output .RMir .RMov .RMtx{position:absolute;left:0;top:0;padding:0}.mw-parser-output .RMir .RMtx{line-height:20px;height:20px;min-height:20px;vertical-align:middle;text-align:center}.mw-parser-output .RMir .RMsp{height:20px;min-height:20px}.mw-parser-output .RMir .RMtx>abbr,.mw-parser-output .RMir .RMtx>div{line-height:.975;display:inline-block;vertical-align:middle}.mw-parser-output .RMir .RMts{font-size:90%;transform:scaleX(.89)}.mw-parser-output .RMir .RMf_{height:5px;min-height:5px;width:20px;min-width:20px}.mw-parser-output .RMir .RMfm{height:100%;min-height:100%;width:4px;min-width:4px;margin:0 auto}.mw-parser-output .RMir .RMo{width:2.5px;min-width:2.5px}.mw-parser-output .RMir .RMc{width:5px;min-width:5px}.mw-parser-output .RMir .RMoc{width:7.5px;min-width:7.5px}.mw-parser-output .RMir .RMd{width:10px;min-width:10px}.mw-parser-output .RMir .RMod{width:12.5px;min-width:12.5px}.mw-parser-output .RMir .RMcd{width:15px;min-width:15px}.mw-parser-output .RMir .RMocd{width:17.5px;min-width:17.5px}.mw-parser-output .RMir .RM_{width:20px;min-width:20px}.mw-parser-output .RMir .RM_o{width:22.5px;min-width:22.5px}.mw-parser-output .RMir .RM_c{width:25px;min-width:25px}.mw-parser-output .RMir .RM_oc{width:27.5px;min-width:27.5px}.mw-parser-output .RMir .RM_d{width:30px;min-width:30px}.mw-parser-output .RMir .RM_od{width:32.5px;min-width:32.5px}.mw-parser-output .RMir .RM_cd{width:35px;min-width:35px}.mw-parser-output .RMir .RM_ocd{width:37.5px;min-width:37.5px}.mw-parser-output .RMir .RMb{width:40px;min-width:40px}.mw-parser-output .RMir .RMcb{width:45px;min-width:45px}.mw-parser-output .RMir .RMdb{width:50px;min-width:50px}.mw-parser-output .RMir .RMcdb{width:55px;min-width:55px}.mw-parser-output .RMir .RM_b{width:60px;min-width:60px}.mw-parser-output .RMir .RM_cb{width:65px;min-width:65px}.mw-parser-output .RMir .RM_db{width:70px;min-width:70px}.mw-parser-output .RMir .RM_cdb{width:75px;min-width:75px}.mw-parser-output .RMir .RMs{width:80px;min-width:80px}.mw-parser-output .RMir .RMds{width:90px;min-width:90px}.mw-parser-output .RMir .RM_s{width:100px;min-width:100px}.mw-parser-output .RMir .RM_ds{width:110px;min-width:110px}.mw-parser-output .RMir .RMbs{width:120px;min-width:120px}.mw-parser-output .RMir .RMdbs{width:130px;min-width:130px}.mw-parser-output .RMir .RM_bs{width:140px;min-width:140px}.mw-parser-output .RMir .RM_dbs{width:150px;min-width:150px}.mw-parser-output .RMir .RMw{width:160px;min-width:160px}.mw-parser-output .RMir .RM_w{width:180px;min-width:180px}.mw-parser-output .RMir .RMbw{width:200px;min-width:200px}.mw-parser-output .RMir .RM_bw{width:220px;min-width:220px}.mw-parser-output .RMir .RMsw{width:240px;min-width:240px}.mw-parser-output .RMir .RM_sw{width:260px;min-width:260px}.mw-parser-output .RMir .RMbsw{width:280px;min-width:280px}.mw-parser-output .RMir .RM_bsw{width:300px;min-width:300px}, Plans for an eastwest downtown subway line date back to the early 20th century, most of which ran along Queen Street. This manual contains important safety directions as well as instructions for setting up the product and operating it. Both flexible and fixed height poles are common to see according to figure No 4 below. Place the total station in the spot from which you want to stake out points after you have finished entering the coordinates for the area into the total station's internal memory. Posted by : admin On : October 24, 2020. This station would be a transfer point for Line 5 Eglinton and TTC buses. The northeastern terminus of the Ontario Line would be Science Centre station at Don Mills Road and Eglinton Avenue. This manual contains important safety directions as well as instructions for setting up the product and operating it. Their usage doesnt offer hard copies of field notes. The digital theodolite, initially introduced in the late 1960s by Carl Zeiss Inc., helped to set the platform for modem field data collection and processing. [7][6] A groundbreaking ceremony for the project took place on March 27, 2022. Running under Queen Street, it will cross under Line 1 at the station; the Lower Queen ghost station (a remnant of the never-completed Queen subway line) will be used for transferring between the two lines. Otherwise, then the retro-reflector offset correction has to be determined and implemented to found spaces. Verify It is useful for measuring horizontal angles, vertical angles, and distance it does this by analyzing the slope between itself and a specific point. Still, tremendous productivity gains have been reported. The Leica TPS1100 Professional Series was designed to provide practical solutions to make surveying processes simple, efficient and productive. Operating distance range - of remote control (diameter): 5 - 328 ft. IP protection class: IP 55 (EN 60529) 2. There will be an emergency exit on the north side of Front Street, just east of Berkeley Street. [9] Upon opening, the plan is for the line to assume the "Line 3" moniker currently used by Line 3 Scarborough, which is expected to close in 2023. Hostels near Union Station, Toronto - Booked.net Select "HD" to stake out using angle and distance, or "XYZ" to stake out with 3D coordinates. Set up and use Total Station/EDM equipment for establishing control, detail surveying, setting out and coordinate checks. Choose the model. This resulted in accomplishing the stake-out of all 20,000 points in 4 days." Between King and Queen Streets, the line would make a broad north-to-west curve to run west under Queen Street through Moss Park station (between Shuter and Sherbourne Streets), Queen station (at Yonge Street) and Osgoode station (at University Avenue). The station will service a future office development. With the construction of the Ontario Line, the corridor would eventually have six tracks.) [47][60][61], Because of the urban density near Queen station, in August 2021, Metrolinx proposed closing Queen Street to road traffic between Victoria and Bay Streets and to streetcar traffic between Church and York Streets for 4.5 years for station construction. Whether you use total stations or software with these brands, the TinySurveyor will offer its full range of features. 1800-123-7177, Email: info [at] civilsimplified [dot] com, Construction Technology (Career Building Course). 2b). The following are some of the major advantages of using total station over the conventional surveying instruments : Field work is carried out very fast. Once the area has been mapped out, you can use the total station to perform a task called a stake out. From there you can mount the total station onto the tripod while using the plumb-bob to center it over the mark. [ citation needed ] Profession [ edit ] The trees were about 70 years old. How To Stake Our Points Staking out points is one of the most common uses for a total station. SITENG - Setting Out #7 \"Stakeout\" In today's video I am showing how to use the Stakeout program using a Total Station. Press CONT by using the F1 key. To fully understand the use of surveying instruments, take a course from a licensed surveyor. The hands-on experience is invaluable in understanding the more abstract concepts associated with mathematics and instrument operation. The staked out points were marked using the taping pins. The Ontario Line station will have centre platforms and two entrances. Press Enter. PDF Advanced Surveying Lab Manual - Iare application of binomial distribution in civil engineering eames replica lounge chair review eames replica lounge chair review Coordinate calculation. TcpET Surveying and Setting Out using Total Station Introduction This application, installed in a pocket PC, allows the user to survey and stake out topographical data using a wide range of total stations, connected through a standard cable or through wireless Bluetooth technology. ta. An entire station is a combination of a digital theodolite, an electronic distance measuring device (EDM) and a microprocessor with a memory unit. Doubts were expressed that the line could be completed within budget and by 2027. Ensure that the ground is flat and the tripod stand is firmly established on the ground. Otherwise, use the following settings to create your own setting and to save it. [50], In 2019, Metrolinx was considering a means to link Exhibition station to Ontario Place to the south. Working with Northern Survey Supply makes this organization safer and more efficient. Purchase Congratulations on the purchase of a Leica TS11/TS15. 24.31 Assume that a 100-ft entry spiral will be used with the curve of Problem 24.7 9. ; A recent reassessment of Stonehenge (c.2500 BC) suggests that the monument was set out by prehistoric surveyors using peg and rope geometry. TcpET Surveying and Setting Out using Total Station Construction Total Stations - Hilti USA Inspecting the EDM of the total station 23 Instrument errors in the total station 24 Simple surveying tasks 26 Aligning from the mid-point 26 Measuring slopes 27 Measuring right-angles 28 Applications programs 29 Calculating areas 29 Staking out 30 Remote heights 31 Tie distances 32 Free-station surveys 33 The applications programs available 34 This study aims to: (1) develop the concept of instructional media based on total station animation video which is used to measure building stake out; (2) developing interactive media designs; (3 . Read carefully through the User Manual before you switch on the product. Queen station already has seven entrances, including some in the Toronto Eaton Centre and at the Hudson's Bay Queen Street complex, and no additional entrances are planned. Hence, it could be difficult for the surveyor to look over and assess the work whilst surveying. Trimble TSC3, Total Station or GNSS receiver, Trimble Access v2015.22, AutoCAD Civil 3D 2014/2016 . See More. This process is very useful for people who stakeout from a . The program Most use a three-screw, forced-centering Wild-type tribrach bracket to fasten and align the total station together with the tripod. Point number (you may want to use different point-numbers for the station points and topo points) Target height (for prism pole shots measure from the ground to the centre of the prism Code (depending on what your software does with it, e.g. [5], A ground-breaking ceremony attended by Ford, Tory, and other politicians and officials was held on March 27, 2022 at Exhibition Place, despite no major contracts having been awarded at that point. Ltd. All Rights Reserved. We are committed to being everywhere our customers need us to be and authorized resellers, such as NSS Canada, are invaluable in helping us to fulfill that commitment. https://youtube.com/watch?v=2GCCaKlxmAU, Controlling Vertical Towers w3.leica-geosystems.com. Stake out using Total station - YouTube . Distance resolution is either pulsed (low precision) or phase comparison (average - 2 to t 5 millimeter(mm) accuracy). [27] The Globe and Mail reported that no previous plan had ever considered making Ontario Place a rapid transit destination and that the announcement surprised everyone, including mayor of Toronto John Tory. Builder, Table of Contents 3 2 How to Set Up Builder with Height 32 2.1 Transfer Elevation to Builder The station building belongs to the City of Toronto while the shed and tracks belong to Metrolinx, the provincial transit agency.
Licking County Warrants,
Claimtech Solutions Lawsuit,
Radio Caroline Power Increase,
Equilon Enterprises Llc Houston, Tx,
1800 Milenio Vs Don Julio 1942,
Articles S